LOGICOR LAUNCHES LOGIC233 @DAGENHAM

Logicor has launched LOGIC233 @Dagenham, the largest available logistics unit within the M25, appointing DTRE, JLL and Savills as joint letting agents.

The warehouse space, totalling 232,965 sq ft is strategically located on the A13 corridor, an established East London industrial warehouse location, adjacent to the former Barking Power Station, recently acquired by the City of London Corporation, which is being considered as a potential for consolidation of three wholesale food markets, bringing further investment to the area.

LOGIC233 @Dagenham is available to let from May 2019. The warehouse space benefits from Grade A specification and unrestricted B8 use, with 12m clear internal height, lighting throughout, existing capacity for 6,840 pallets and a total potential racking capacity of 24,300-32,400 pallets.

In addition to the fully refurbished office space, the site has a 50m yard depth, 20 dock levellers, 3 level access doors and 49 5GV/trailer parking spaces, with 144 car parking spaces.

Mike Best, Director, Asset Management at Logicor, says: “LOGIC233 @Dagenham is a unique building providing 232,965 sq ft of high-quality warehouse pace in a strategic inner-city London location. As such, we have already received a great deal of interest in the newly available unit and we are excited to be formally brining this building to the market.”